Streets:
-
Staff repaired
several street lights
-
Staff
cleaned East & West Main Street
-
Staff
painted several fire hydrants
-
Staff
worked with Frederick County Paving to repave
Creekside Drive
Water:
-
Rainbow Lake
is mow 15" below the spillway level
-
The roughing
filters are now being backwashed twice per day
and the DE filters are being done once per week
-
Staff has
added copper sulfate to Rainbow Lake for the last time
this year
-
Staff installed a new screen in the
valve house at Rainbow Lake
-
-
Water
production and consumption. We produced and
purchased an average of 343,326 gpd. We consumed
an average of 297,256 gpd
-
The
difference is "Backwash Water" ...(13.4%). We purchased
362,100 gals.
of water from MSM this month.
-
49.1 of this
water came from wells
-
3.5% of this water
came from Mt. St. Mary's
-
47.4% of this
water came from Rainbow Lake
Wastewater:
-
The overland
and flow treatment system is now up and running
-
Staff has
discontinued discharging to the irrigation system at
Mason Dixon Farms for the season
-
We received
about 3.9 inches of precipitation this month (the
average is 4.2 inches)
-
Wastewater
Treatment:
-
We treated
an average of 323,000 gpd (consumed 297,256 gpd)
which means that 7.9% of the wastewater treated this
month was "wild water".
-
We
experienced no spills of untreated sewerage
during the month of August
-
We did not
exceed the plant's design capacity on any day during
the month of Septembe
Trash:
Parks:
-
Staff
winterized the swimming pool
-
Staff installed a new net on the basketball
hoop in Community Park, they also replaced some swing
seats in Memorial Park
-
Staff
performed the monthly maintenance inspection, mowing
and trimming
Meetings
Attended:
-
09/01 Meeting
with wastewater plant design engineers
-
09/02 Bid
opening Lincoln Ave. water & sewer rehab project
-
09/04 meeting
with the Mayor to review budget matters
-
09/08 Meeting
with resident to discuss parking matters
-
09/17
Meeting with County Commissioners and Municipal
leaders
-
09/22
Meeting with the Town attorney to discuss and review
the Southgate SWM pond and its approval
-
09/25
Meeting with the Town Clerk and the auditors related
to the FY2009 budget review and audit
list
of prior months' Town Manager's reports
|
|
|
|
|
|