Town Manager's
Report December 2007
Prepared by
David Haller
Streets:
-
Staff
plowed snow and treated streets
-
Staff has
repaired a number of street lights
-
Staff
inspected all street lights on Ramblewood Drive
Water:
-
Rainbow Lake
is now 2.0 feet below the spillway and our five wells
appear to be recovering
-
The roughing
filters are now being backwashed three times per day
and the DE filters are being done once per week
-
The existing water use
restrictions which prohibit all outdoor water use are
showing showing some results, daily consumption has
dropped over the last two months
-
Water
production and consumption. We produced and
purchased an average of 342,790 gpd. We consumed
an average of 295,877 gpd (up 21,809 gpd or 87 taps
over November 2007)
-
The
difference is "Backwash Water" ...(13.7%). We purchased
515,800 gals.
of water from MSM this month.
-
52.7% of this
water came from wells
-
4.8% of this water
came from Mt. St. Mary's
-
42.5% of this
water came from Rainbow Lake
Wastewater:
-
Staff
shut-down the overland treatment system in mid
December for the season
-
We received
about 5.1 inches of precipitation this month (the
average is 3.3 inches)
-
Wastewater
Treatment:
-
We treated
an average of 682,000 gpd (consumed 295,877 gpd)
which means that 43.4% of the wastewater treated this
month was "wild water".
-
We
experienced no spills of untreated sewerage
during the month of December
-
We exceeded the plant's design capacity
seven days during the month of December 12/2
935,000 gpd 12/9 892,000 gpd
12/15 1,285.000 gpd 12/16
2,169,000 gpd 12/17 860,000 gpd
12/30 1,183,000 gpd 12/31
1,062,000 gpd
Trash:
Parks:
Meetings
Attended:
-
12/04 meeting
with the Town's After School Program staff to review
and discuss program operations
-
12/05 meeting
with Mayor Hoover, Commissioner Blanchard and Chris
Jakubiak to review and discuss the Planning
Commission's Comp Plan update efforts and needs
-
12/14 meeting
Frederick County Planning Staff to review new water
allocation plan requirements
-
12/19 meeting
with land owner to discuss his commercial subdivision
and related issues
-
12/20 met with
staff and design engineers to review East Lincoln Ave.
water and sanitary sewer rehab project