Streets:
- Staff installed
Fallen Firefighters signs and banners
- Staff repaired a
number of street lights
- Staff has been
repairing some speed bumps
- Staff has
installed new stop signs on East North Avenue
Water:
- Staff has been
maintaining the flow from Rainbow Lake at about
120 gpm, which has reduced the draw on the wells
- Staff has again
flushed the raw water line from Rainbow Lake to
the water treatment plant
- Staff found and
repaired two water leaks - one on the Provincial
House Property and one on North Seton Avenue
- The pump in Well
#5 went down this month, but has now been replaced
and is back on line. Also, staff is getting
the required testing of Well #4 started so it can
be brought on line very soon
- Water production and consumption. We
produced and purchased an average of 408,122 gpd.
We consumed an average of 372,840293 gpd.
- The difference is "Backwash Water"
...(8.6%). We purchased 634,800 gals. of water from MSM this month.
- 50.3% of this water came from wells
- 06.0% of this water came from Mt. St. Mary's
- 43.7% of this water came from Rainbow Lake
Wastewater:
-
We didn't have any
raw sewerage spills in the month of Septemer
-
Mason Dixon Farms
has been irrigating all month - by draw from the
Town's release reservoir
-
The "overland
flow" treatment system is in use and working
well and the irrigation system is running
-
We received about
0.3 inches of precipitation this
month
-
Wastewater Treatment:
- We treat an average of
310,000 (consumed 372,840 gpd) which means that
0% of the wastewater treated this month was
"wild water"
- We did not
exceed
the plant's design capacity on 0 days in the
month of September
Trash:
-
Trash
pickup days will remain Monday & Thursday for the
month of October
Parks:
-
Staff is performing
standard maintenance - on all
playground equipment, ballfields and mowing
and trimming
Meetings Attended:
- Proposed cell
tower construction
- Brookfield
pressure reduction valve
- On new Bollinger
Homes facility
- On regional growth
and its impact
- On the new
Emmitsburg Glass facility
- Grant funding for
Sewer Plant emissions upgrade
- Bid opening for
the resurfacing of West DePaul Street
List of prior
months' Town Manager's reports |
|
|
|
|